Dynamic scheduling for hot rolling production by hierarchical reinforcement learning and heterogeneous graph neural networks
Publication Type
Journal Article
Publication Date
10-2026
Abstract
Dynamic hot rolling scheduling is a challenging problem in steel manufacturing due to the coupling between reheating and rolling, multiple conflicting objectives, and uncertainties in real-world production environments. Existing optimization methods typically struggle to deliver high solution quality within real-time computational limits and fail to handle the long-term decision dependencies in dynamic environments. To address these limitations, we propose a novel dynamic scheduling approach based on hierarchical reinforcement learning (HRL) and heterogeneous graph neural networks (HGNNs) for hot rolling production under stochastic slab arrivals. Our HRL framework features two coordinated agents: a high-level agent that learns to dynamically partition newly arrived slabs into a sequence of subproblems while capturing their long-term dependencies, and a low-level agent designed as a neural solver to solve each subproblem in real time. For efficient decision-making, the low-level agent adopts a discrete–continuous hybrid decision scheme, where the discrete decision process is structured over a heterogeneous graph representation, and an HGNN-based policy network is designed to exploit the structured relational information between slabs and furnaces to construct high-quality scheduling plans. Furthermore, we introduce a simple yet effective auxiliary loss encouraging feasibility awareness to stabilize training. Experiments based on a real-world production case demonstrate that our approach outperforms existing methods in both solution quality and computational efficiency, and remains robust across diverse instance distributions, objective configurations, and production settings.
Discipline
Artificial Intelligence and Robotics | Operations Research, Systems Engineering and Industrial Engineering
Research Areas
Intelligent Systems and Optimization
Publication
IEEE Transactions on Industrial Informatics
First Page
1
Last Page
12
ISSN
1551-3203
Identifier
10.1109/TII.2026.3738890
Publisher
Institute of Electrical and Electronics Engineers
Citation
YUAN, Haofeng; CAO, Zhiguang; PENG, Jianing; YANG, Wanlu; ZHANG, Yuli; and SONG, Shiji.
Dynamic scheduling for hot rolling production by hierarchical reinforcement learning and heterogeneous graph neural networks. (2026). IEEE Transactions on Industrial Informatics. 1-12.
Available at: https://ink.library.smu.edu.sg/sis_research/11414
Additional URL
https://doi.org/10.1109/TII.2026.3738890