On a Paper by Christofides Et Al. For Solving the Multiple-Resource Constrained, Single Project Scheduling Problem
Publication Type
Journal Article
Publication Date
1994
Abstract
In a recently published article in EJOR, Christofides et al. (CAT) present a depth-first search, branch-and-bound solution procedure for the multiple-resource constrained, single project scheduling problem. While there are many important contributions in this paper, we show by counterexample that if the branching strategy described by the authors is used, the optimal solution might not result. Computational experience on a set of test problems appearing in the open literature is reported both with the original branching strategy suggested by the authors and a modified branching strategy that we propose. The modified strategy guarantees the determination of the optimal solution in all instances of the problem at the expense of an increase in node evaluations and average CPU time. Computational results using the revised procedure and a hybrid, breadth-first search procedure also investigated by CAT are reported.
Discipline
Business
Research Areas
Operations Management
Publication
European Journal of Operational Research
Volume
76
Issue
1
First Page
218
Last Page
228
ISSN
0377-2217
Identifier
10.1016/0377-2217(94)90018-3
Publisher
Elsevier
Citation
Demeulemeester, E; Herroelen, W; Simpson, W.P; Baroum, S; Patterson, J. H.; and Yang, Kum Khiong.
On a Paper by Christofides Et Al. For Solving the Multiple-Resource Constrained, Single Project Scheduling Problem. (1994). European Journal of Operational Research. 76, (1), 218-228.
Available at: https://ink.library.smu.edu.sg/lkcsb_research/2226